doi: 10.7763/IJCTE.2011.V3.318
Multi Criteria Job Shop Schedule Using Fuzzy Logic Control for Multiple Machines Multiple Jobs
- 1Department of Master of Computer Applications,Maharaja Engineering College, Avinashi, Coimbatore Tamilnadu, India.
- 2Department of Master of Computer Applications, Kongu Engineering College, Perundurai, Erode, Tamilnadu, India.
- 3Department of Computer Science and Engineering, bhrathiyar University, Coimbatore, Tamilnadu, India.
Abstract
In the present scenario the modern engineering and industrial manufacturing units are facing lot of problems in many aspects such as machining time, raw material, manpower, electricity, and customer’s constraints. Such a complex problem of vagueness and uncertainty can be handled by the theory of fuzzy logic based in using a membership function to solve a fuzzy mix product selection. We use the amalgamation of fuzzy job shop scheduling approach to find profits and customer satisfaction using a fuzzy -JSP approach [1].
Keywords
- Job shop scheduling
- Fuzzy Logic
- Production Planning
- Multi criteria
How to Cite
R. Ramkumar, A. Tamilarasi, and T. Devi, "Multi Criteria Job Shop Schedule Using Fuzzy Logic Control for Multiple Machines Multiple Jobs," International Journal of Computer Theory and Engineering, vol. 3, no. 2, pp. 282-286, 2011. https://doi.org/10.7763/IJCTE.2011.V3.318
Copyright & License
Copyright © 2011 by the authors. This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited (CC BY 4.0).